Skip to main content

Floodplain reconnection in the Vallei van de Grote Nete, Belgium

National Id
Belgium_02
Site name
Grote Nete between Oosterlo and Nijlen
Summary
This scheme is part of the Sigmaplan programme, which is a long-term large-scale programme in Belgium aiming to improve flood storage of the Scheldt catchment. This particular scheme, on the Grote Nete, reconnects the river to its floodplain, which is currently isolated by dykes along both river banks. In the middle reach of the catchment, ‘controlled water storage areas’ will be developed, where a connection between the river and floodplain will be introduced but controlled. In the upper and lower catchment, free connection between the river and floodplain will be restored, allowing development of more natural forest, grassland and wetland habitats. The details of the scheme are still being finalised, taking in to account the results of studies and modelling, and implementation will be timed in the best interests of the local landowners.
Light or indepth?
In-depth
The in-depth description of the case study
Location description
The measure is located along the floodplain of the Grote Nete, between the towns of Oosterlo and Nijlen, in northern Belgium.
NUTS Code
Prov. Antwerpen
RBD code
BESchelde_VL
Transboundary
0
Data provider
Heather Williams and Chris Binje, AMEC
Full Context
Collection(aka Doorway or Gallery)
Case Studies
Pathway(aka Context)
Area(aka Level or Site)