General National Id Romania_ 07 Site name Lower Prut Floodplain Natural Park Summary The project's objective was to improve the conservation status of aquatic bird species in Lower Prut Floodplain Natural Park, Galati County, Romania, through a series of strategic interventions involving scientific inventory, monitoring activities, sites restoration, raising awareness activities, implementation of the park management plan and designating four Special Protected Area - Romanian Natura 2000 sites. Partners were the University of Bucharest, Romanian ornithological society and Romsilva-Galati Forestry. Light or indepth? Light NUTS Code Sud-Est RBD code RO1000 Transboundary 0 Data provider Barbu Constantin, RECImola Koszta, REC Source(s) Some aspects concerning wetland restoration programs in the Prut River Basin Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park Ecological Reconstruction works - Pochina Lake NWRM(s) implemented in the case study Floodplain restoration and management Lake restoration Longitude 28.096111 Latitude 45.991667 Site information Climate zone cool temperate dry Mean rainfall 500 Mean rainfall unit mm/year Average temperature 11 Type Case Study Info Vegetation class The aquatic vegetation; palustrian vegetation; Monitoring maintenance Monitoring impacts effects 1 Monitoring parameters Monitoring of birds populations status: 1. Establishing a birds species monitoring program; 2. Establishing the facilities for the birds watching monitoring; Assessing the bio-accumulation of organic chlorine pesticides in birds. Design & implementations Application scale River Installation date 2010-10 Area (ha) 74,8000030517578 Area subject to Land use change or Management/Practice change (ha) 41,7999992370605 Favourable preconditions Wetlands belong to the category of ecologically fragile areas, their dynamic being influenced mainly by the qualitative and quantitative characteristic of the water in the hydrographical basin in which they extend. For this reason, the conservation measures promoted in these spaces must be doubled by a strict control of the anthropic activities / arrangements using water for different purposes or as a medium of discharging some wastes. Public consultation 1 Design contractual arrangement Arrangement type Responsibility Role Comments Name Design consultation activity Activity stage Key issues Name Comments Implementation phase These include information dissemination, consultation of every village in the area, and active participation and education with local educational material to be produced. The project takes into account that there is a relatively high illiteracy in the area and will address stakeholders in wide variety of ways, including picture books, nature trails, six annual environment days with expeditions into the area, children's exhibitions, and bird watching towers Awareness raising activities Design land use change Land use change type Design authority Authority type Role Responsibility Name Comments Regional / sub-national water authority Implementation Regional Environmental Protection Agency Galati Other Financing County Council Galati County Council Other University of Bucharest, Research Center for Environment and Impact Studies Research and development ceter for the environment NGO Monitoring Romanian Ornithological Society Forest owners Forestry Department Galati NGO Park Administration Lower Prut Floodplain Other Other The administrative circumscription of Suceveni Commune, Rogojeni Village Lessons, risks, implications... Key lessons The works at works of Pochina Lake assures, by gravitational transfer a sufficient water volum to contribute to the conservation of this special area, designated Special Protected Area (SPA). Success factor(s) Success factor type Success factor role Comments Attitude of decision makers main factor Financing Financing type Comments National funds The Ministry of Environment and the Sustainable Development Local funds Galati County Council EU-funds: LIFE+ The European Commission - LIFE Nature Barrier Barrier type Barrier role Comments Driver Driver type Driver role Comments Organisation committed to it main driver Financing share Financing share type Share Comments European funds 50 412.355 Euro View National funds 50 412.355 Euro View Policy, general governance and design targets Policy description The ecological reconstruction works carried out within the project ensure, by gravitational transfer, a water volume, enough to contribute to the conservation of this special conservation area, declared SPA. Also, this water transfer from the Prut into Pochina Lake will allow for the cleaning of the bottom of the lake in the future, together with the excess of water being evacuated the extra alluvial deposits, too. With a view to maintain the water level, dykes were built on the channels as well as footbridges for the free circulation. Quantified objectives The ecological reconstruction works proposed by the project and achieved during the year 2009, consisted in the cleaning and re-profiling of the two channels connecting Pochina Lake and Prut River, respectively the supply channel (L=362m) situated in the eastern extremity of the lake, and the evacuation channel (L= 235 m) situated in the western extremity. The dredging of the mud from Pochina Lake was carried out by the removal of the aquatic vegetation and the elimination of the mud on a part of the lake, i.e. the enlarging of the entrance area of the supply channel into the lake. Part of wider plan 1 Policy target Target purpose Increase Water Storage Improved Biodiversity Groundwater Recharge Policy pressure Pressure directive Relevant pressure Policy area Policy area type Policy area focus Name Comments Policy impact Impact directive Relevant impact Policy wider plan Wider plan type Wider plan focus Name Comments National Environment & Biodiversity Lower Danube Green Corridor programme Policy requirement directive Requirement directive Specification Socio-economic Direct benefits information Better conditions for the birds population; increasing the number for aquatic bird species (especially those listed in Annex I of Birds Directive, Bern Convention and in ORNIS lists); improve the trophic state and saprobity of the target aquatic systems; allowing the water oxygenation of the lakes through the input of the fresh water from the Prut River; including the monitoring birds protocols in the adaptive Management Plan of Lower Prut Floodplain Natural Park; Ancillary benefits information Supply the potential of fisheries resources; using the potential of providing services for tourism and recreation; Costs total 824710 Ecosystem improved biodiversity 1 Information on Ecosystem improved biodiversity Restoration of aquatic birds sites in the natural protected area located in Lower Prut Floodplain Natural Patk - Pochina Lake Full Context Pathway(aka Context) Default view Area(aka Level or Site) ALL