General National Id Slovenia_06 Site name Ljubljanica river Summary Removing barriers to fish migration, enhancing and restoring habitats, improving the water management infrastructure, and putting in place a water monitoring system. Project funded by LIFE+ and carried out by Purgator Engineering Ltd. in responsibility of Ljubljana University. Light or indepth? Light NUTS Code Zahodna Slovenija RBD code SI_RBD_1 Transboundary 0 Data provider REC Source(s) Ljubljanica Connects Ljubljanica connects - Restoration of the Ljubljanica River corridor and improvement of the river's flow regime NWRM(s) implemented in the case study Removal of dams and other longitudinal barriers Longitude 14.575 Latitude 46.047 Site information Climate zone cool temperate moist Mean rainfall 1339 Mean rainfall unit mm/year Average temperature 12 Type Case Study Info Design & implementations Application scale River Installation date 2015-12 Design contractual arrangement Arrangement type Responsibility Role Comments Name Design consultation activity Activity stage Key issues Name Comments Design land use change Land use change type Design authority Authority type Role Responsibility Name Comments Initiation of the measure University of Ljubljana, Fakulteta za gradbeništvo in geodezijo Determination of design details of the measure Purgator Engineering Ltd. Company for Engeneering Constructions Implementation Geateh d.o.o. Company for Engeneering Constructions Lessons, risks, implications... Success factor(s) Success factor type Success factor role Comments Financing Financing type Comments EU-funds: LIFE+ 0.492 National funds 0.2 Sub-national funds 0.197 Private funds 0.111 Barrier Barrier type Barrier role Comments Driver Driver type Driver role Comments Financing share Financing share type Share Comments European funds 49,2000007629395 View Policy, general governance and design targets Policy description Heavy degradation of the ecological functioning of the Ljubljanica River corridor “upstream and downstream of the Ljubljana urban area“ towards the confluence with the Sava, and further upstream along the Sava. Policy target Target purpose Improved Biodiversity Policy pressure Pressure directive Relevant pressure Policy area Policy area type Policy area focus Name Comments Policy impact Impact directive Relevant impact Policy wider plan Wider plan type Wider plan focus Name Comments Policy requirement directive Requirement directive Specification Socio-economic Costs capital 1188015 Full Context Pathway(aka Context) Default view Area(aka Level or Site) ALL