The case study is located in the north central Poland, in Kuyavian-Pomeranian province. The catchment area is about 150 km2. Due to highly fertile soils, arable land prevails (nearly 90%) in the catchment. The main crops are cereals, maize, oilseed rape, sugar beet, alfalfa, vegetables and herbal crops. An area covered by catch crops is increasing. Share of irrigated crops is small. The catchment is coping with an increasing water deficit for crop production and high nitrate loads and concentrations in water. These problems are amplified by low precipitation (annual average equals to 500 mm being the lowest in the country, 300 mm in the growing season) and the extensive drainage system (open ditches and subsurface tiles) that drains water excess in wet periods.

The OPTAIN project will support the case study team with identifying and developing efficient land management strategies and small technical solutions to improve the soils’ infiltration and water holding capacities as well as its capacity to filter, buffer and transform pollutants.
Latitude
52.65967
Longitude
19.05471
Project
Optain
National Id
PL_04

Location of the project
The Zlowiaczka river basin is located in central Poland, western of Warsaw. The basin is characterized by a strong agricultural presence, with 90% of the land being arable, and only 4% forested.
Design Authority
Authority type Authority name Role Comments
Site name
Upper Zglowiaczka River Basin
Light or indepth?
Light
Transboundary
0

Climate zone
cool temperate moist
Temperature
8,5
Mean annual rainfall
300 - 600 mm
Average slope range
flat (0 - 2%) to gentle (3 - 5%)
Depth groundwater
less than 5m

Design land use change
Land use change type Comment
Contractual arrangements
0
Design contractual arrangement
Arrangement type Responsibility Role Name Comments

Financing
Financing type Authority name Share Comments
Financing(old)
Financing type Comments
Financing share(old)
Financing share type Share Comments

Community involvment
No
Design consultation activity
Activity stage Key issues Name Comments
Policy target
Target purpose
Policy area
Policy area type Policy area focus Name Comments
Wider plan type
Wider plan type Wider plan focus Name Comments
Requirement directive
Requirement directive Specification
Part of wider plan
0
Policy pressure
Pressure directive Relevant pressure
Policy impact
Impact directive Relevant impact

Success factor(s)
Success factor type Success factor role Comments
Barrier
Barrier type Barrier role Comments
Driver
Driver type Driver role Comments
Key lessons
Surveys were carried out with stakeholders to better understand barriers and challenges to implementing NWRM in the agricultural sector. Of the 19 informants interviewed, all agreed that policy mechanisms were not adapted to resolving the environmental and water quantity concerns of stakeholders.

The following barriers to NWRM implementation were identified: administrative barriers, voluntary measures, low benefit-cost, complicated implementation, land ownership issues.
Financing mechanism
0

The in-depth description of the case study
Monitoring impacts effects
0