Skip to main content

Constructed wetland in Vidrare, Bulgaria

National Id
Bulgaria_06
Site name
St. Panteleimon Home for children, Vidrare
Summary
The Women in Europe for a Common Future (WECF), implemented the first constructed wetland in Vidrare, Pravetz, Bulgaria, for on-site treatment of domestic waste water of a children's home combined with capacity building for professionals.
Light or indepth?
Light
NUTS Code
Югозападен (Yugozapaden)
RBD code
BG1000
Transboundary
0
Contact
REC
Sponge Measure(s) implemented in the case study
Longitude
24.01
Latitude
42.99305
Climate zone
warm temperate moist
Precipitation
507
Mean rainfall unit
mm/year
Temperature
11
Average imperviousness
100
Type
Case Study Info
Average slope range
5.0
Monitoring impacts effects
1
Monitoring location
Laboratory
Performance impact estimation method
Edge of Field/Plot
Performance impact estimation information
Difference between samples in inflow and outflow
Application scale
Building
Installation date
2011-04
Performance timescale
< 1 year
Area subject to Land use change or Management/Practice change (ha)
0,0399999991059303
Size
0,0659999996423721
Size unit
ha
Max water retention capacity
11
Max water retention capacity unit
m3/day
Constraints
Presence of many underground cables and pipes, which had not been mentioned in previous documentation.
Favourable preconditions
Existing sewerage, gully and river as receiving water, slope in the yard and available space
Outflow volume
11
Outflow volume unit
m3/day
Community involvment
Yes
Design contractual arrangement
Arrangement type Responsibility Role Name Comments
Design consultation activity
Activity stage Key issues Name Comments
Seminar
November 19th, 2010; 25 particiapsnts; &#039;Related to the construction of the first constructed wetland in bulgaria
National Conference
April 29th, 2011 in Gran Hotel Sofia; Presenting constructed wetlands as a sustainable and cost-effective wastewater treatment system
Design land use change
Land use change type Comment
Design Authority
Authority type Authority name Role Comments
NGO
Women in Europe for a Common Future (WECF)
Initiation of the measure
International ONG
Local water authority
Pravets Municipality
Initiation of the measure
Co-funding
Ecoworld 2007 of Bulgaria
Initiation of the measure
NGO
German Federal Environmental Fundation
Financing
Otter Wasser
Determination of design details of the measure
Also instruction of staff for the maintenance of the constructed wetland
Key lessons
Small scale constructed wetland for water treatment could be good demonstration of specific type of NWRM with direct economic and water quality benefits. Constructed wetlands are so far rarely used in spite of the successful pilot tests.
Financing difficulties
0
Success factor(s)
Success factor type Success factor role Comments
Financing possibilities
main factor
Attitude of relevant stakeholders
secondary factor
Financing(old)
Financing type Comments
Other
German Federal Environment Foundation
Barrier
Barrier type Barrier role Comments
Driver
Driver type Driver role Comments
Organisation committed to it
main driver
WECF NGO
Financing share(old)
Financing share type Share Comments
Policy description
Ground water contamination due to untreated sewage discharge
Part of wider plan
0
Policy target
Target purpose
Pollutants Removal
Policy pressure
Pressure directive Relevant pressure
Policy area
Policy area type Policy area focus Name Comments
Policy impact
Impact directive Relevant impact
Wider plan type
Wider plan type Wider plan focus Name Comments
Requirement directive
Requirement directive Specification
Costs investment
45000
Costs operational information
The operation and maintenance costs depends on the local cost of energy and staff. Require time and energy supply: time 1.5h/week; energy 2kWh/d; sludge disposal 36m3/yr
Total cost
45000
Costs total information
Investment costs: excavation and piping(12000), per-treatment step (6000); Soil filter: liner(6000), grave and sand(7000), pipes (9500), pumps (4500)
Ecosystem improved biodiversity
0
Ecosystem provisioning services
0
Ecosystem water supply
0
Ecosystem impact climate regulation
Not relevant for the specific application
Retained water
272
Retained water unit
m3/month
Increased water storage
272
Increased water storage unit
m3/month
Ecosystem erosion control
0
Water quality overall improvements
Positive impact-WQ improvement
Soil quality overall soil improvements
Not relevant for this application