Skip to main content

Pilootprojecten Stroomgebied Voer

Year
2013
Abstract
This presentation gives a short graphical overview of two executed NWRM's on the Horstergrub river less than one on the Belgian side of the border, one on the Dutch side of the border. The NWRM on the Belgian side of the border is the discussed NWRM.
Authors
Ben Simons
Source type
Project Report
Full Context
Pathway(aka Context)
Area(aka Level or Site)