Year 2010 Abstract A 172 ha town planning project has been developed near Reims (France) for the last five years. For one of the catchments of this area (72ha) a 15 000 m3 detention pond is being built, in a difficult hydrogeological context since ground water level may rise up to the natural ground. Authors Grégoire JOST, Emmanuel GAULME, Bruno RICARD, Stéphane LANTHIER, Alain JAQUINET Publisher NOVATECH Case study(ies) Constructed wetland with reed bed filters near Reims, France Source type Website URL http://documents.irevues.inist.fr/bitstream/handle/2042/35637/12208-175RIC.pdf?… Full Context Pathway(aka Context) Default view Area(aka Level or Site) ALL